The Fulcro Execution Process

7 steps. Defined deliverables. QC gates at every milestone.

1

Design Handoff & Documentation

Receive architectural drawings, BOQ, design intent, material specifications.

Deliverable: Design review report with clarifications
2

Shop Drawings & Engineering

Develop detailed shop drawings, fabrication plans, CNC files, MEP coordination.

Deliverable: Approved shop drawings with client/architect sign-off
3

Material Procurement

Source materials per specs, quality checks, vendor coordination, delivery scheduling.

Deliverable: Material arrival confirmation with test certificates
4

Factory Production

CNC cutting, assembly, finishing (lacquer/veneer), pre-installation QC checks.

Deliverable: Factory QC approval and dispatch readiness
5

Site Coordination

Civil readiness verification, site access preparation, installation sequencing.

Deliverable: Site readiness checklist completion
6

Installation & QC Gates

On-site installation, milestone inspections, snag resolution, functional testing.

Deliverable: QC gate clearance with photographic evidence
7

Handover & Documentation

Final inspection, warranty documentation, maintenance guides, project closeout.

Deliverable: Handover certificate and complete as-built documentation

What Makes This Process Different

Defined Milestones

Every step has clear deliverables and approval gates. No work proceeds without sign-off.

Factory Integration

CNC precision manufacturing reduces on-site errors. Components arrive ready for installation.

Real-Time Tracking

Dashboard visibility for architects and clients. Timestamped updates at every milestone.

Single Accountability

One partner from design to handover. No finger-pointing between vendors.