What This Framework Does

  • Defines six mandatory QC gates at critical project milestones
  • Establishes dimensional tolerances for all fabrication and installation work
  • Requires material test certificates and quality verification
  • Enforces digital documentation with timestamped photos at every checkpoint
  • Tracks corrective actions with resolution timelines and re-inspection

Six Mandatory QC Gates

1
Gate 1

Design Review

Inspection Checks:

  • Drawing completeness and clarity
  • Material specifications verification
  • BOQ alignment with design intent
  • Scope clarification and documentation
Clearance Required: Design review report with architect/client sign-off
2
Gate 2

Shop Drawing Approval

Inspection Checks:

  • Dimensional accuracy vs. site measurements
  • Fabrication feasibility assessment
  • Material specifications confirmation
  • Hardware and fixture schedules
Clearance Required: Approved shop drawings with stamps from architect and client
3
Gate 3

Material Inspection

Inspection Checks:

  • Material grade and quality verification
  • Test certificates from suppliers
  • Visual inspection for defects
  • Quantity reconciliation against PO
Clearance Required: Material arrival log with QC approval and photo documentation
4
Gate 4

Factory QC

Inspection Checks:

  • Dimensional accuracy per shop drawings
  • Finish quality and consistency
  • Hardware operation and alignment
  • Pre-dispatch packing inspection
Clearance Required: Factory QC checklist completion with supervisor sign-off
5
Gate 5

Site Installation Inspection

Inspection Checks:

  • Installation alignment and levelness
  • Finish protection and site cleanliness
  • Functional testing (doors, drawers, systems)
  • Snag list documentation and resolution timeline
Clearance Required: Installation QC approval with photographic evidence
6
Gate 6

Final Handover

Inspection Checks:

  • Comprehensive walkthrough with client
  • All snags closed with re-inspection
  • Warranty documentation provided
  • Maintenance guidelines handed over
Clearance Required: Handover certificate with client acceptance signature

Quality Standards & Tolerances

Millwork & Cabinetry

  • Dimensional accuracy: ±2mm on linear dimensions
  • Gap tolerances: 2-3mm for reveal details
  • Levelness: ±1mm per meter run
  • Finish uniformity: No visible color variation within same batch

Lighting Installation

  • Fixture alignment: ±5mm from design intent
  • Lux levels: ±10% of specified design values
  • Dimming curves: Smooth 0-100% without flicker
  • Color temperature: ±200K from specified CCT

AV & Automation

  • Cable management: No visible cables in finished areas
  • System response time: <2 seconds for automation triggers
  • Audio calibration: ±3dB variance across listening zones
  • Network reliability: 99.9% uptime for control systems

Site Works

  • Surface preparation: Clean, dry, level per material requirements
  • Material staging: Protected storage with environmental control
  • Site cleanliness: Daily cleanup and waste segregation
  • Safety compliance: PPE mandatory, accident-free site protocols

How Standards Are Enforced

No Gate, No Progress

Work cannot proceed to the next phase without QC gate clearance and documentation.

Independent Inspectors

QC teams operate independently from execution teams to ensure unbiased inspection.

Digital Audit Trail

Every inspection is timestamped, photographed, and logged for complete traceability.

Experience Quality-Driven Execution

See how Fulcro's quality framework ensures flawless delivery on every project.

Get in Touch
Chat with us