Interior Finishes & Site Coordination

Interior Finishes
& Site Coordination

False ceiling, flooring, wall finishes, MEP coordination — executed with precision and quality control.

Our Approach

Site Execution with
Engineering Discipline

Interior finishing is where design intent meets reality. We bring factory precision to site execution— defined processes, quality checkpoints, and systematic coordination across all trades.

01

Process-Driven

Every trade follows defined sequences with QC gates. No shortcuts, no guesswork.

02

Coordinated Execution

MEP, false ceiling, flooring, and wall finishes planned together—preventing clashes and rework.

03

Quality Documented

Photo evidence at every checkpoint. Real-time progress tracking with milestone verification.

What We Execute

Complete interior finishing with single-window coordination

🏗️

False Ceiling Systems

Gypsum board ceilings, metal grid systems, acoustic panels, and design ceilings with integrated lighting.

  • Level checks and structural clearance verification
  • Service integration (lighting, HVAC, sprinklers)
  • Moisture-resistant boards in wet areas
  • Seamless joint finishing with primer and paint
🪨

Premium Flooring

Marble, granite, vitrified tiles, engineered wood, and solid hardwood flooring installed with precision.

  • Sub-floor leveling and moisture testing
  • Pattern matching and alignment verification
  • Grouting with color-matched or epoxy grout
  • Polishing and sealing for stone surfaces
🎨

Wall Finishes

Paint, wallpaper, texture, wall paneling, stone cladding, and feature wall execution.

  • Wall preparation: putty, sanding, priming
  • Premium paint brands with proper coverage
  • Wallpaper installation with pattern alignment
  • Texture and specialty finishes coordination

MEP Coordination

Integration of mechanical, electrical, and plumbing systems with interior finishes.

  • Service routing coordination before ceiling closure
  • Electrical and plumbing fixture installation
  • HVAC grille and diffuser alignment
  • Fire safety and sprinkler integration

Detailed Service Breakdown

Comprehensive execution across all interior finishing trades

🏗️

False Ceiling Systems

Our false ceiling execution ensures perfect integration with lighting, HVAC, and fire safety systems—engineered for both aesthetics and functionality.

Types We Execute

Gypsum Board Ceilings
  • Standard gypsum (9mm/12mm thickness) for dry areas
  • Moisture-resistant boards for bathrooms and kitchens
  • Fire-rated boards for safety-critical zones
  • Seamless joint finishing with multiple coats of putty
Metal Grid Systems
  • Exposed T-bar grid with acoustic tiles
  • Concealed grid with gypsum tiles
  • Aluminum/MS framework with precise leveling
Design Ceilings
  • Multi-level designs with cove lighting
  • Curved and radial ceiling sections
  • Coffered ceiling with decorative panels
  • Integrated lighting channels and recesses

Our Process

  1. 1.Structural Survey: Load-bearing capacity check, service routing identification
  2. 2.Framework Installation: MS/aluminum channels with proper spacing and leveling
  3. 3.Service Integration: Coordination with electrical, HVAC, fire sprinkler teams
  4. 4.Board Installation: Screwing/clipping with proper joints and expansion gaps
  5. 5.Joint Treatment: Tape + putty application, sanding, priming
  6. 6.Final Finishing: Paint or texture application, lighting cut-outs

Quality Standards

  • Level tolerance: ±2mm over 3 meters
  • Joint gaps: Maximum 2mm before treatment
  • Screw spacing: 200mm for gypsum, per manufacturer specs
  • Fire-rated assembly where required by code
🪨

Premium Flooring

Precision installation ensuring longevity, proper drainage, and visual perfection across all flooring types.

Types We Execute

Natural Stone (Marble, Granite)
  • Italian/Indian marble with book-matched slabs
  • Granite (polished/honed/flamed finish)
  • Slab selection and pattern matching
  • Epoxy grouting and sealing
Engineered Materials
  • Vitrified tiles (600x600, 800x800, 1200x1200)
  • Porcelain tiles with rectified edges
  • Large-format tiles (minimal joints)
  • Anti-skid tiles for wet areas
Wooden Flooring
  • Engineered wood (7-12mm wear layer)
  • Solid hardwood (oak, walnut, teak)
  • Herringbone/chevron patterns
  • Floating or glued installation
Specialty Flooring
  • Epoxy/PU industrial flooring
  • Vinyl/SPC click-lock systems
  • Carpet tiles for offices
  • Anti-static flooring for server rooms

Our Process

  1. 1.Sub-floor Preparation: Leveling compound application, moisture testing
  2. 2.Layout Planning: Pattern design, tile/plank placement strategy
  3. 3.Adhesive Application: Proper coverage and comb size selection
  4. 4.Installation: Level checking, spacer usage, alignment verification
  5. 5.Grouting: Color-matched or epoxy grout application
  6. 6.Finishing: Polishing (stone), sealing (wood), cleaning

Quality Standards

  • Flatness tolerance: ±3mm over 2 meters
  • Lippage (tile edge difference): Maximum 1mm
  • Grout joint width: 2-3mm for tiles, 1mm for rectified
  • Moisture content: <12% for wooden flooring substrate
🎨

Wall Finishes

From paint to specialty textures—executed with surface preparation excellence and finish consistency.

Types We Execute

Paint Finishes
  • Emulsion (matt/satin/eggshell)
  • Acrylic weather-coat for exteriors
  • Enamel for wood and metal surfaces
  • Premium brands: Asian Paints, Dulux, Nippon
Wallpaper & Wall Covering
  • Vinyl, fabric, and textured wallpapers
  • Pattern matching and alignment
  • Seam concealment techniques
  • Moisture-resistant adhesives
Texture & Specialty Finishes
  • Stucco and Venetian plaster
  • Metallic and pearl finishes
  • Concrete-effect designer textures
  • Stencil and faux finishes
Wall Cladding
  • Natural stone cladding (10-20mm thickness)
  • Decorative brick/stone veneers
  • Wood paneling (coordinated with millwork)
  • 3D wall panels (MDF/PVC/gypsum)

Our Process

  1. 1.Surface Preparation: Filling cracks, leveling, sanding rough patches
  2. 2.Putty Application: Two coats of wall putty, sanding between coats
  3. 3.Priming: Sealer primer for uniform paint absorption
  4. 4.Paint Application: Two finish coats with proper coverage (120-140 sq ft/liter)
  5. 5.Quality Check: Uniform color, no streaks, smooth finish

Quality Standards

  • Surface flatness: No visible undulations under raking light
  • Paint coverage: 10-12 sq m per liter per coat (surface dependent)
  • Drying time: 4-6 hours between coats, 24 hours final cure
  • Color matching: Tinting done centrally, not on-site

MEP Coordination

Seamless integration of Mechanical, Electrical, and Plumbing systems with interior finishes—the invisible infrastructure that makes spaces function.

What We Coordinate

Electrical Systems
  • Switch/outlet box positioning before false ceiling
  • Conduit routing for lighting fixtures
  • Panel board locations and cable pathways
  • Light fixture cut-outs and mounting support
HVAC Integration
  • AC grille and diffuser alignment with ceiling grid
  • Concealed duct routing above false ceiling
  • Thermostat and control panel positioning
  • Drainage pipe routing for AC units
Plumbing Fixtures
  • Sanitary fixture alignment (toilets, basins, taps)
  • Concealed plumbing behind false walls
  • Floor drain positioning and slope verification
  • Water supply and drainage coordination
Fire Safety Systems
  • Sprinkler head integration with ceiling design
  • Smoke detector positioning per fire code
  • Emergency lighting and exit signage
  • Fire-rated material selection where required

Our Process

  1. 1.Pre-Installation Meeting: Coordination with MEP contractors and consultants
  2. 2.Service Routing Plan: Clash detection, pathway optimization
  3. 3.Rough-In Verification: Checking locations before ceiling/wall closure
  4. 4.Progressive Installation: Coordinated sequencing of trades
  5. 5.Testing: Functional verification of all integrated systems

Quality Standards

  • All services routed before ceiling closure
  • No clashes between electrical conduit and HVAC ducts
  • Proper access panels for future servicing
  • Compliance with NBC (National Building Code) requirements

Investment Guidance

Interior Finishes Pricing - Bangalore 2025

Professional site execution with quality materials, process discipline, and comprehensive QC. Pricing includes material, labor, and project management.

False Ceiling

Gypsum Board Ceiling

₹180 - ₹280 per sq ft
  • • Standard gypsum (9mm): ₹180 - ₹220/sq ft
  • • Moisture-resistant (12mm): ₹220 - ₹260/sq ft
  • • Fire-rated gypsum: ₹250 - ₹280/sq ft
  • Includes: Framework, boards, joint treatment, primer

Design / Multi-Level Ceiling

₹250 - ₹450 per sq ft
  • • Two-level with cove lighting: ₹250 - ₹350/sq ft
  • • Complex curves and radial sections: ₹350 - ₹450/sq ft
  • • Coffered/decorative panels: ₹400 - ₹600/sq ft

Metal Grid Ceiling

₹150 - ₹300 per sq ft
  • • Exposed grid with acoustic tiles: ₹150 - ₹220/sq ft
  • • Concealed grid with gypsum tiles: ₹220 - ₹300/sq ft

Flooring

Vitrified Tiles

₹200 - ₹400 per sq ft
  • • Standard 600x600mm: ₹200 - ₹280/sq ft (incl. material + labor)
  • • Premium 800x800mm: ₹280 - ₹350/sq ft
  • • Large format 1200x1200mm: ₹350 - ₹450/sq ft

Marble / Granite

₹300 - ₹800 per sq ft
  • • Indian marble with installation: ₹300 - ₹500/sq ft
  • • Italian marble: ₹600 - ₹1,200/sq ft (material rates vary widely)
  • • Granite (polished/honed): ₹250 - ₹450/sq ft

Wooden Flooring

₹350 - ₹800 per sq ft
  • • Engineered wood: ₹350 - ₹550/sq ft
  • • Solid hardwood (oak/walnut): ₹550 - ₹800/sq ft
  • Includes: Sub-floor preparation, installation, finishing

Wall Finishes

Paint (Premium Brands)

₹80 - ₹180 per sq ft
  • • Standard emulsion (Asian Paints Royale): ₹80 - ₹120/sq ft
  • • Premium emulsion with texture: ₹120 - ₹180/sq ft
  • • Exterior weather-coat: ₹100 - ₹150/sq ft
  • Includes: Putty, primer, two finish coats

Wallpaper

₹150 - ₹400 per sq ft
  • • Standard vinyl wallpaper: ₹150 - ₹250/sq ft
  • • Premium fabric/textured: ₹250 - ₹400/sq ft
  • Includes: Surface preparation, adhesive, installation

Specialty Finishes

₹180 - ₹600 per sq ft
  • • Venetian plaster / texture: ₹180 - ₹350/sq ft
  • • Stone/brick cladding: ₹300 - ₹600/sq ft
  • • 3D wall panels: ₹250 - ₹450/sq ft

Typical Project Investment

1,000 sq ft Apartment

(False Ceiling + Flooring + Paint)

₹5L - ₹10L

2,000 sq ft Home

(Complete Interior Finishes)

₹12L - ₹25L

4,000 sq ft Villa

(Premium Finishes Throughout)

₹30L - ₹60L+

What's Included in Pricing

Material procurement and quality verification
Site preparation and cleaning
Skilled labor with supervisor oversight
Quality control at defined checkpoints
Daily progress tracking and photo documentation
MEP coordination and integration
Waste disposal and site cleaning
Warranty: 1 year workmanship + material manufacturer warranty

*Pricing varies based on material brands, finish complexity, and site conditions. Premium/imported materials billed at actuals.

Project Timeline

Interior Finishes Execution Schedule

Interior finishing is typically the final phase of construction, happening after structural and MEP rough-in work is complete.

1

Phase 1: Planning & Material Selection

1 week

  • Site Assessment: Existing condition survey, measurement verification
  • Material Selection: Tile/stone selection, paint color finalization, finish samples
  • MEP Coordination: Meeting with electrical/plumbing/HVAC contractors
  • Scheduling: Trade sequencing and milestone planning
2

Phase 2: False Ceiling Execution

2-3 weeks

  • Framework Installation: MS/aluminum channel mounting (3-5 days)
  • Service Integration: Electrical, HVAC, fire safety coordination (2-3 days)
  • Board Installation: Gypsum board fixing and joint treatment (1 week)
  • Finishing: Putty, sanding, priming (3-5 days)
3

Phase 3: Flooring Installation

2-4 weeks

  • Sub-floor Preparation: Leveling, moisture treatment (3-5 days)
  • Tile/Stone Laying: Installation with proper adhesive and grouting (1-2 weeks)
  • Wooden Flooring: Sub-floor prep + installation + finishing (1.5-2 weeks)
  • Polishing/Sealing: Final surface treatment (2-3 days)
4

Phase 4: Wall Finishing

1-2 weeks

  • Surface Preparation: Filling, leveling, sanding (3-4 days)
  • Putty & Priming: Two coats putty + primer (4-5 days)
  • Paint Application: Two finish coats (3-4 days)
  • Specialty Finishes: Wallpaper, texture, cladding (1-2 weeks depending on scope)
5

Phase 5: MEP Final Fixing

3-5 days

  • Electrical Fixtures: Switch plates, light fixtures, outlets
  • Plumbing Fixtures: Taps, showers, sanitary ware
  • HVAC Completion: Grille installation, thermostat mounting
6

Phase 6: Final Inspection & Handover

2-3 days

  • Punch List: Identifying and rectifying minor issues
  • Touch-up Work: Paint touch-ups, grout cleaning
  • Final Cleaning: Complete site cleaning and debris removal
  • Documentation: Warranty certificates, maintenance guidelines

Total Duration: 6-10 weeks

For typical 2,000-3,000 sq ft residential project

Timeline Factors

⏱️

Project Size

Larger homes require more time proportionally

⏱️

Finish Complexity

Multi-level ceilings and specialty finishes add time

⏱️

Material Availability

Imported tiles/stone may have lead times

⏱️

Weather

Exterior painting and flooring affected by monsoons

⏱️

MEP Coordination

Delays in electrical/plumbing impact finish schedule

Sequencing with Other Trades

Week 1-2:False ceiling framework (parallel to millwork installation)
Week 3-4:False ceiling finishing + flooring starts
Week 5-6:Wall finishing + MEP final fixing
Week 7-8:Millwork installation completes, final touch-ups
Week 9-10:Complete cleaning, punch list, handover

*Interior finishes are the last major trade before furniture and final styling.

Frequently Asked Questions

About Interior Finishes & Site Coordination

Q: What's the difference between your execution and a regular contractor?

A: We bring factory-level quality control to site execution—defined processes, QC checkpoints, photo documentation, and systematic coordination. Regular contractors work reactively with ad-hoc quality checks. We work proactively with engineered processes and measurable accountability.

Q: Do you handle false ceiling even if we're not doing millwork with you?

A: Yes. We execute interior finishes as a standalone service. However, our strength is coordinated execution—when we handle millwork + lighting + false ceiling together, we eliminate vendor conflicts and ensure seamless integration.

Q: Can you match paint colors to existing walls?

A: Yes, through spectrophotometer color matching. Bring us a sample or we'll visit the site for measurement. We'll create test patches for approval before full application. Note: Exact matches are challenging with aged/faded paint—we recommend repainting entire walls for uniformity.

Q: What if I want to use materials I've already purchased?

A: We can install client-supplied materials with a few conditions: materials must meet quality standards, we verify quantities before starting, and warranty coverage is limited to workmanship (not material defects). Generally, we prefer to procure materials to ensure quality control.

Q: How do you ensure level false ceilings?

A: Laser levels for initial marking, theodolite for large areas, and manual level checks every 2 meters during framework installation. Level tolerance: ±2mm over 3 meters. We document levels with photos before board installation—you can verify accuracy before we proceed.

Q: What's the warranty on interior finishes?

A: 1-year workmanship warranty covering defects in installation (ceiling cracks, tile lifting, paint peeling due to poor prep). Material defects covered by manufacturer warranty (we facilitate claims). Damage from misuse, water seepage, or structural issues not covered.

Q: Can you work around existing furniture?

A: Preferably not—interior finishing requires empty rooms for proper prep and protection. If unavoidable, we'll cover and protect furniture, but risk of dust/damage increases. Best results come from empty spaces. We can work room-by-room if you're occupied during renovation.

Q: How do you handle site cleaning?

A: Daily cleaning protocols—debris removed at end of each day, dust sheets protect finished areas, final deep cleaning before handover. Cleanliness is part of our quality process, not an afterthought. We believe professional execution includes professional site discipline.

Q: What if there are site delays from other contractors?

A: We maintain buffer timelines and coordinate closely with all trades. If delays occur, we re-sequence work to minimize impact. However, prolonged delays may require rescheduling our teams. Clear communication and weekly coordination meetings prevent most issues.

Q: Do you handle exterior painting and waterproofing?

A: Yes, exterior weather-coat painting and basic waterproofing (terrace, balconies). For complex waterproofing issues (basement tanking, facade restoration), we work with specialist sub-contractors but maintain single-window accountability for coordination.

Our Execution Process

Systematic execution with quality checkpoints

01

Site Assessment & Planning

Detailed survey of existing conditions, structural clearances, and service routing requirements. Coordination with MEP consultants and architects.

02

Material Selection & Approval

Specification of false ceiling systems, flooring materials, wall finishes, and coordination with your design intent and budget.

03

Execution & Quality Control

Systematic installation with defined QC checkpoints. Daily progress tracking and photo documentation at every milestone.

04

MEP Integration & Testing

Coordination with electrical, plumbing, HVAC teams. Testing of all integrated systems before final handover.

05

Final Finishing & Handover

Touch-up work, final cleaning, and complete documentation with warranty certificates and maintenance guidelines.

Quality Standards

Every trade follows defined specifications and checkpoints

Material Standards

  • Pre-approved material specifications and samples
  • Brand verification and quality certificates
  • No substitutions without architect approval
  • Batch consistency checks for visible finishes

Installation Standards

  • Level and alignment checks at every stage
  • Photo documentation at QC checkpoints
  • Daily site cleaning and material protection
  • Final punch-list completion before handover

Why Fulcro Interior Finishes vs Traditional Contractors

Process-driven execution with engineering discipline

FeatureFulcroOthers
Quality Control ProcessDefined QC gates with photo documentationAd-hoc inspection by contractor
MEP CoordinationIntegrated planning with all tradesReactive fixes when clashes occur
Material StandardsPre-approved specifications and samplesSubstitutions without client knowledge
Progress Tracking
Site CleanlinessDaily cleaning protocols maintainedCleaned at project end only
Warranty CoverageComprehensive warranty with documentationVerbal promises, limited follow-up
Architect CoordinationContinuous alignment with design intentMinimal coordination after approval
Timeline Adherence

All comparisons based on industry standards for design-led interior execution in Bangalore

Complete Your Project

Related Services

These services work seamlessly with Interior Finishesfor comprehensive project execution under single-window accountability.

Why Integrated Execution Matters

When Fulcro handles multiple services together, you eliminate vendor coordination, ensure finish consistency across trades, and benefit from milestone-based quality control. One partner, one timeline, one standard.